Skip to content
Commit 1b85147b authored by Imre Deak's avatar Imre Deak
Browse files

drm/i915/gen9_lp: Increase DDI PHY0 power well enabling timeout

On GLK sporadic timeouts occur during PHY0 enabling. Based on logs it looks
like they happen sometime after a system suspend/resume cycle, with the
same power well enabling succeeding both before and after the failed
one and no other problems observed. The current timeout in the code is
not actually specified by BSpec, so let's try to increase that until a
BSpec update.

Bugzilla: https://bugs.freedesktop.org/show_bug.cgi?id=105771


Signed-off-by: default avatarImre Deak <imre.deak@intel.com>
Link: https://patchwork.freedesktop.org/patch/msgid/20180409122716.4055-1-imre.deak@intel.com


Reviewed-by: default avatarVille Syrjälä <ville.syrjala@linux.intel.com>
parent 8b69449d
0% or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment