Skip to content
Commit 175746eb authored by Peter Oberparleiter's avatar Peter Oberparleiter Committed by Martin Schwidefsky
Browse files

s390/cio: Delay scan for newly available I/O devices



The CIO layer scans for newly available I/O devices by performing a scan
of available subchannels using the Store Subchannel (STSCH) instruction.
Performing too many STSCH instructions in a tight loop can cause high
Hypervisor overhead which can negatively impact the performance of the
virtual machine as a whole.

A subchannel scan is triggered for example during a hardware event that
indicates that a channel path has become available. It is also triggered
by the DASD device driver for each device that is set online.

This patch reduces the number of STSCH instructions being performed by
delaying the start of the actual subchannel scan by 1 second. Multiple
scan requests that are scheduled during this time will be merged into a
single scan loop.

The trade-off consists of a short delay that is introduced between
the time that the event is processed and a newly available device
becoming usable. This delay should be acceptable since it only
affects devices that have not been in use before.

Signed-off-by: default avatarPeter Oberparleiter <oberpar@linux.vnet.ibm.com>
Reviewed-by: default avatarSebastian Ott <sebott@linux.vnet.ibm.com>
Signed-off-by: default avatarMartin Schwidefsky <schwidefsky@de.ibm.com>
parent b207f5a8
0% or .
You are about to add 0 people to the discussion. Proceed with caution.
Finish editing this message first!
Please register or to comment