Commit 71173e78 authored by Luben Tuikov's avatar Luben Tuikov Committed by Christian König
Browse files

drm/scheduler: Essentialize the job done callback



The job done callback is called from various
places, in two ways: in job done role, and
as a fence callback role.

Essentialize the callback to an atom
function to just complete the job,
and into a second function as a prototype
of fence callback which calls to complete
the job.

This is used in latter patches by the completion
code.

Signed-off-by: default avatarLuben Tuikov <luben.tuikov@amd.com>
Reviewed-by: default avatarChristian König <christian.koenig@amd.com>
Link: https://patchwork.freedesktop.org/patch/405574/



Cc: Alexander Deucher <Alexander.Deucher@amd.com>
Cc: Andrey Grodzovsky <Andrey.Grodzovsky@amd.com>
Cc: Christian König <christian.koenig@amd.com>
Cc: Daniel Vetter <daniel.vetter@ffwll.ch>
Signed-off-by: default avatarChristian König <christian.koenig@amd.com>
parent 6efa4b46
Loading
Loading
Loading
Loading
+40 −33
Original line number Diff line number Diff line
@@ -60,8 +60,6 @@
#define to_drm_sched_job(sched_job)		\
		container_of((sched_job), struct drm_sched_job, queue_node)

static void drm_sched_process_job(struct dma_fence *f, struct dma_fence_cb *cb);

/**
 * drm_sched_rq_init - initialize a given run queue struct
 *
@@ -162,6 +160,40 @@ drm_sched_rq_select_entity(struct drm_sched_rq *rq)
	return NULL;
}

/**
 * drm_sched_job_done - complete a job
 * @s_job: pointer to the job which is done
 *
 * Finish the job's fence and wake up the worker thread.
 */
static void drm_sched_job_done(struct drm_sched_job *s_job)
{
	struct drm_sched_fence *s_fence = s_job->s_fence;
	struct drm_gpu_scheduler *sched = s_fence->sched;

	atomic_dec(&sched->hw_rq_count);
	atomic_dec(&sched->score);

	trace_drm_sched_process_job(s_fence);

	dma_fence_get(&s_fence->finished);
	drm_sched_fence_finished(s_fence);
	dma_fence_put(&s_fence->finished);
	wake_up_interruptible(&sched->wake_up_worker);
}

/**
 * drm_sched_job_done_cb - the callback for a done job
 * @f: fence
 * @cb: fence callbacks
 */
static void drm_sched_job_done_cb(struct dma_fence *f, struct dma_fence_cb *cb)
{
	struct drm_sched_job *s_job = container_of(cb, struct drm_sched_job, cb);

	drm_sched_job_done(s_job);
}

/**
 * drm_sched_dependency_optimized
 *
@@ -473,14 +505,14 @@ void drm_sched_start(struct drm_gpu_scheduler *sched, bool full_recovery)

		if (fence) {
			r = dma_fence_add_callback(fence, &s_job->cb,
						   drm_sched_process_job);
						   drm_sched_job_done_cb);
			if (r == -ENOENT)
				drm_sched_process_job(fence, &s_job->cb);
				drm_sched_job_done(s_job);
			else if (r)
				DRM_ERROR("fence add callback failed (%d)\n",
					  r);
		} else
			drm_sched_process_job(NULL, &s_job->cb);
			drm_sched_job_done(s_job);
	}

	if (full_recovery) {
@@ -635,31 +667,6 @@ drm_sched_select_entity(struct drm_gpu_scheduler *sched)
	return entity;
}

/**
 * drm_sched_process_job - process a job
 *
 * @f: fence
 * @cb: fence callbacks
 *
 * Called after job has finished execution.
 */
static void drm_sched_process_job(struct dma_fence *f, struct dma_fence_cb *cb)
{
	struct drm_sched_job *s_job = container_of(cb, struct drm_sched_job, cb);
	struct drm_sched_fence *s_fence = s_job->s_fence;
	struct drm_gpu_scheduler *sched = s_fence->sched;

	atomic_dec(&sched->hw_rq_count);
	atomic_dec(&sched->score);

	trace_drm_sched_process_job(s_fence);

	dma_fence_get(&s_fence->finished);
	drm_sched_fence_finished(s_fence);
	dma_fence_put(&s_fence->finished);
	wake_up_interruptible(&sched->wake_up_worker);
}

/**
 * drm_sched_get_cleanup_job - fetch the next finished job to be destroyed
 *
@@ -809,9 +816,9 @@ static int drm_sched_main(void *param)
		if (!IS_ERR_OR_NULL(fence)) {
			s_fence->parent = dma_fence_get(fence);
			r = dma_fence_add_callback(fence, &sched_job->cb,
						   drm_sched_process_job);
						   drm_sched_job_done_cb);
			if (r == -ENOENT)
				drm_sched_process_job(fence, &sched_job->cb);
				drm_sched_job_done(sched_job);
			else if (r)
				DRM_ERROR("fence add callback failed (%d)\n",
					  r);
@@ -820,7 +827,7 @@ static int drm_sched_main(void *param)
			if (IS_ERR(fence))
				dma_fence_set_error(&s_fence->finished, PTR_ERR(fence));

			drm_sched_process_job(NULL, &sched_job->cb);
			drm_sched_job_done(sched_job);
		}

		wake_up(&sched->job_scheduled);